    摘要:

    以某预应力混凝土连续梁桥震后修复工程为例,运用Midas Civil软件建立该桥的有限元模型,分别对单墩顶升、单墩顶升+移动荷载、单墩顶升+梯度升温等三种工况进行分析,研究了支座反力、梁体上下缘应力及预应力钢筋应力的变化规律。研究表明:当桥台处顶升时,相隔墩处主梁上顶板预应力钢筋首先发生断裂;当桥墩处顶升时,千斤顶所对应主梁截面顶板上缘混凝土出现拉裂破坏现象;当顶升高度达到支座更换要求时,在桥台处顶升须对过往车辆实施限行措施,在桥墩处顶升应中断交通;梯度升温对各支座反力、梁体下翼缘应力及预应力钢筋应力产生影响较小,上翼缘应力影响较大,但顶升点处梁体上翼缘由拉应力变压应力,对顶升施工具有一定的积极影响。

    Abstract:

    Taking the post earthquake repair project of a prestressed concrete continuous beam bridge as an example, a finite element model of the bridge was established using Midas Civil software. Three working conditions were analyzed, including single pier uplift, single pier uplift+moving load, and single pier uplift+gradient heating. The variation laws of support reaction force, upper and lower edge stress of the beam, and stress of prestressed steel bars were studied. Research has shown that when the bridge pier is lifted, the prestressed steel bars on the top plate of the main beam at the separated pier first break. When the bridge pier is lifted, the concrete on the top edge of the main beam section corresponding to the jack experiences tensile cracking and damage. When the lifting height reaches the requirement for bearing replacement, traffic restrictions must be implemented for passing vehicles when lifting at the bridge pier, and traffic should be interrupted when lifting at the bridge pier. The gradient heating has a relatively small impact on the reaction force of each support, the stress of the lower flange of the beam, and the stress of the prestressed steel bars, while the stress of the upper flange has a greater impact. However, the tensile stress and compressive stress of the upper flange of the beam at the jacking point have a certain positive impact on the jacking construction.

    参考文献
    相似文献
    引证文献
引用本文

艾庆华,马文芳,胡佳欢,严鑫.大跨预应力混凝土连续梁桥单墩顶升技术研究[J].河北工程大学自然版,2025,42(4):49-56